Project

Federal Realty

Client
South Bay Construction
Location
San Jose

Project Overview

Located directly across from Santana Row, Federal Realty is an eight-story, 934,750 square foot, class A office space. It was designed to maximize open space, employing a tension concrete system to eradicate beams in the interiors. CWI installed manual shades on multiple floors. In the amenity space, motorized shades, drapery, and Kaynemaile were installed. Working alongside designers and the GC, CWI was able to provide guidance on Unistrut placement points along the post-tensioned concrete ceiling to ensure proper mounting of motorized shading system.

Federal Realty - overview

Project Staff

Federal Realty - project staff
Project Executive
Joah Widman
Preconstruction Team
Nick Massa & Rob Adams
Safety Officer
Daniel Sorci
Lead Installer
Joniver Cavan

Overcoming Project Challenges

Specialty Products
Installed “Kaynemaile” – a heavy specialty architectural mesh product from New Zealand. This product has a 16-week lead time. CWI took the lead in coordination between designer and manufacturer to ensure the product was installed to meet design intent.
Product Modifications
CWI custom wrapped the track with black film (manufacturer's standard track was clear anodized) to maintain building standards.
Site Coordination
Coordinated with GC to ensure Unistrut was placed with minimal impact to post tensioned concrete ceiling.
Federal Realty - overviewCONTACT US